Helium News

Global Helium Industry Intelligence

Energies, Vol. 18, Pages 5666: Collaborative Renewable Energy Resource Siting and Sizing Planning Method for Distribution and Sub-Transmission Networks

Energies, Vol. 18, Pages 5666: Collaborative Renewable Energy Resource Siting and Sizing Planning Method for Distribution and Sub-Transmission Networks

Energies doi: 10.3390/en18215666

Authors:
Jun Xiao
Guowei He
Chengjin Li

Existing methods plan the distribution network and sub-transmission network separately. This paper proposes a collaborative renewable energy resource siting and sizing planning method for distribution and sub-transmission networks to increase the renewable energy ratio in high-load density industrial parks and promote the hosting capacity of the power grid. First, to accurately measure planning effectiveness, a renewable energy ratio calculation method is proposed, which comprehensively considers the contributions of green electricity from the power grid and renewable energy generation inside and outside the industrial park. Second, a collaborative planning model is proposed, which optimizes access points and access capacity in the distribution and sub-transmission networks for renewable energy around the park. The net load is better matched with the output of renewable energy outside the park through demand response, thereby maximizing the utilization of the park load to host more renewable energy. Finally, the proposed method is verified in a real industrial park. The method outperforms traditional planning methods in terms of renewable energy ratio in the park and renewable energy hosting capacity outside the park.

Leave a Reply

Your email address will not be published. Required fields are marked *